UPS and Uninterruptible Power Supplies

Showing 1-12 of 17 results

Compare uninterruptible power supply (UPS) and backup-power listings on PV.market for equipment protection and continuity needs. Specify the load, power quality and required backup duration before reviewing exact models and supplier quotations.

Sort by:
Show:
1000W
Verified
ACDC 1000W Pure Sine Portable Back-up Kit
UPS
600W
Verified
ACDC 600W Pure Sine Portable Back-up Kit
UPS
300W
Verified
ACDC 300W Pure Sine Portable Back-up Kit
UPS
SOLD OUT
5500VA
Verified
Pulsar Solar Pcu 5.5 Kva/96V
UPS
United Arab Emirates
United Arab Emirates
1 Week
3 pcs
SOLD OUT
900VA
Verified
Pulsar Home Ups 900/12V
UPS
United Arab Emirates
United Arab Emirates
1 Week
1 pcs
SOLD OUT
3500VA
Verified
Pulsar Home Ups 3500/48V
UPS
United Arab Emirates
United Arab Emirates
1 Week
8 pcs
SOLD OUT
2500VA
Verified
Pulsar Home Ups 2500/36V
UPS
United Arab Emirates
United Arab Emirates
1 Week
10 pcs
SOLD OUT
10000VA
Verified
Su-Kam Colossal 10kVA/360V
UPS
United Arab Emirates
United Arab Emirates
1 Week
1 pcs
SOLD OUT
10000VA
Verified
Su-Kam Ups Collosal 10Kva/180V
UPS
United Arab Emirates
United Arab Emirates
1 Week
2 pcs
Page 1 of 2

The current catalog includes ACDC backup-power products and Pulsar and Su-Kam UPS listings. UPS and backup-power products vary in capacity, output waveform, battery arrangement, transfer behaviour and intended application. A nominal VA or watt rating alone does not establish runtime or suitability. Compare the full model documentation with the equipment that must remain powered.

For a control room, communications equipment or another essential load, list the devices and their starting and running requirements. For a replacement, check input and output connections, installation space and maintenance arrangements. Have the designer evaluate the power architecture and any redundancy needs.

PV.market recommends sizing from the real load and required autonomy before comparing price. Schneider Electric's UPS selection resources illustrate how runtime depends on load and the selected configuration. Request model-specific runtime data, battery details, operating instructions and warranty terms from each supplier.

Review ESS products and solar inverters where the wider power-system design requires them, and compare BOS components for installation. Request a UPS project quote with the load schedule, power input, output requirements, target runtime, quantity and destination.

Frequently Asked Questions

How do I determine the right UPS size?
List the equipment load and required runtime, then have the system designer compare exact UPS ratings and model-specific runtime data.
Does a VA rating tell me the backup duration?
No. Runtime depends on the load and battery configuration. Request the manufacturer's runtime information for the proposed model and load.
What should a UPS RFQ include?
Provide the load schedule, input and output requirements, required autonomy, installation conditions, quantity, destination and target date.
Are UPS products and ESS products interchangeable?
No. They can serve different power-quality, transfer and energy-storage roles. Have the designer specify the function and documented configuration required.

Cookie preferences

We use cookies to improve site functionality, analyze traffic, and personalize marketing. You can accept all cookies or manage your preferences. Read our Privacy and Cookies Policy.